Originally uploaded by lindakaybuckley
We now are starting on the inside of building. It now is wired, AC is mounted and keeping the building a cool 72 degrees for now. We rwrapped the building with bubble wrap between the meatal. THe buble wrap has about a 6 of better R factor. We also put R-13 insulation in the ceiling and between the rafters. Now ready for the paneling.